Sir Myghin wrote:my fender amp doesn't mind being plugged by carvins, but hey, thats the stuff amps dream of
Awwwwwwwww YEAH!!!
speaking of which, paid off my axe yesterday and megan asked how far about it was, they said just finishing, ready for the final stages (frets and electronics I assume) so it will definitely ship ontime, maybe early.
Sir Myghin wrote:my fender amp doesn't mind being plugged by carvins, but hey, thats the stuff amps dream of
Awwwwwwwww YEAH!!!
speaking of which, paid off my axe yesterday and megan asked how far about it was, they said just finishing, ready for the final stages (frets and electronics I assume) so it will definitely ship ontime, maybe early.
Aw man, exciting!
I've only been through the build process once, back in 2002. I carried the catalog with me everywhere, showing whoever would look what I was waiting for!
My other one that I bought new from the factor was an in-stock, so I had it within 10 days. not the same at all.
This is my 3rd self torture session , the first one took 9-10 weeks to arrive, the bass took 12 to build and shipping on a Friday, then the states had a holiday , so didn't arrive til the NEXT Tuesday (worst episode ever). This one was quoted as 6 wk time, April 30th expected completion.
This wait has been a lot easier for some reason, probably the high powered exam expectations.
Sir Myghin wrote:This is my 3rd self torture session , the first one took 9-10 weeks to arrive, the bass took 12 to build and shipping on a Friday, then the states had a holiday , so didn't arrive til the NEXT Tuesday (worst episode ever). This one was quoted as 6 wk time, April 30th expected completion.
This wait has been a lot easier for some reason, probably the high powered exam expectations.
Congrats Myg. It'll be worth the wait, and aren't all good things worth
waiting for?
Sir Myghin wrote:This is my 3rd self torture session , the first one took 9-10 weeks to arrive, the bass took 12 to build and shipping on a Friday, then the states had a holiday , so didn't arrive til the NEXT Tuesday (worst episode ever). This one was quoted as 6 wk time, April 30th expected completion.
This wait has been a lot easier for some reason, probably the high powered exam expectations.
Congrats Myg. It'll be worth the wait, and aren't all good things worth
waiting for?
you've seen my bass, you tell me
Also Elf, I would assume bolts take less long as neck and body can be made at the same time, and a standard neck is usually sat out drying premade. 6-8 wks was pretty standard 2 years ago when I orderred the first time, last year was a huge book that bumped it up around 12-16 I think. So more like back to normal, I would think.